Average P.F. – improvement = Lower Bill & Lower
Load.
Energy consumed Vs production.
Load Shedding/Load Restrictions/ Loss of production.
2.OWN
GENERATION
Capacity & Utilisation.
Capacity of Generating Sets & Cost of Production.
Power Wheeling to sister units/Power planning.
Power Generation Mix – Hydel/Thermal/Diesel/Gas
& Non conventional (Wind/solar/Biogas).
3.UTILISATION
EFFICIENCY
Monitoring Of Production Vs energy consumption to
improve plant efficiency/reduce energy cost/Reduce Man
power/Improve Maintenance/ control quality of
spares/Machine and replacement programme.
Energy consumption in productive/Supportive and
Non-productive uses and controlling energy waste.
B.
DOCUMENTS
REQUIRED – FOR PRELIMINARY STUDY
Electricity Bills for last 24
months (xerox copy)
Copy of Tariff Book &
Agreement with Electricity Board.
Date
wise or month wise production
figures.
Date
wise or month wise power
consumption at Plant/Office/Residential consumption.
Energy consumption at Different
output levels for Major Equipment of Plant –
Manufacturer’s Data.
AVOMEC GROUP 2AB,Bright Apartments, 7,Bright
Street, Calcutta-700019.
INDIA. Fax:091-33-2400268 Phone:091-33-2479811 091-33-2471904
E-Mail: avomec@vsnl.com